Knowledge base
Projects We Supply
Indian infrastructure and industrial projects Sealinkers has supplied with lifting and rigging equipment — high-speed rail, sea links, metro lines, refineries, nuclear power and ports. Each case study says what we supplied, which lifts it served, and what the job teaches a buyer. Supply details come from our own order records; project facts are cited to public sources.
26 guides
Mundra Petrochem PVC Complex, Mundra: Heavy-Lift Shackles and Slings
The heavy shackles, large wire rope slings and synthetic slings we supplied directly to Mundra Petrochem's PVC complex at Mundra, and how to rig a carbide, chlor-alkali and PVC build.
ProjectsVersova–Bandra Sea Link: Wire Rope, Slings and Mooring Ropes for Apco Infratech
The wire rope, slings, mooring ropes and marine hardware we have supplied to Mumbai's Versova–Bandra Sea Link since 2022, and lessons for marine construction buyers.
Thane–Borivali Twin Tunnel: Endless Slings and Heavy Rigging for MEIL
The heavy endless slings, master links and multi-leg assemblies we supplied to MEIL's Thane-side package of Mumbai's twin road tunnel, and how to specify them.
ProjectsSurat Metro Underground Package 1: Rigging Supply to the Gulermak–SAM India JV
How Gulermak–SAM India bored Surat Metro's first underground tunnels, the rope, slings and fittings we supplied the JV from late 2024 to early 2026, and what station work asks of rigging.
Reliance Vinyl Programme, Nagothane: Heavy Rigging for L&T Energy Hydrocarbon
The heavy shackles and wire rope slings we supplied to L&T Energy Hydrocarbon for Reliance's new VCM and PVC units at Nagothane, and how to rig heavy lifts inside an operating complex.
Reliance Jamnagar Complex and Sikka Port: Anchor Chain, Wire Rope and Rigging
The marine chain, wire rope and lifting gear we supply directly to Reliance's Jamnagar complex and Sikka Ports & Terminals, and what a coastal terminal asks of rigging.
Pune Underground Metro: Heavy Wire Rope, Slings and Shackles for Cemindia Projects
Cemindia's twin-tunnel metro works under south Pune, the heavy rope, endless slings and Crosby shackles we have supplied since 2026, and how to specify them.
ProjectsPune Metro Line 3: Casting-Yard Rigging for Tata Projects at Dange Chowk
How Tata Projects built the 23.2 km elevated Hinjewadi–Shivajinagar line, the casting-yard tackle we supplied during 2024–25, and what segment yards ask of rigging.
ProjectsONGC PRP-IX Offshore Pipeline Replacement: Project Rigging for Lamprell
The project rigging we supplied to Lamprell for ONGC's PRP-IX subsea pipeline replacement project, and what offshore pipeline and topside work asks of slings, shackles and hoists.
ProjectsNayara Energy Vadinar Refinery: Snatch Blocks, Wire Rope and Stud Link Chain
The snatch blocks, wire rope and stud link chain we supplied to Nayara Energy's Vadinar refinery, and how to size snatch blocks and sheaves for refinery maintenance lifting.
ProjectsNagpur Metro Phase 2: Wire Rope Slings, Chain and Shackles for Kalpataru's C-11
Kalpataru's three-reach viaduct package on Nagpur Metro Phase 2, the slings, chain, blocks, jacks and shackles we have supplied since 2025, and lessons for buyers.
Mumbai Metro Line 7A: Rigging for J. Kumar's Underground Airport Package CA-48
What Sealinkers and Zebra Weblift supplied to J. Kumar Infraprojects' underground Line 7A site at Mumbai airport, and what a TBM shaft near a runway asks of rigging.
Mumbai Metro Line 6: Rigging for J. Kumar's Jogeshwari and Powai Packages
What Sealinkers and Zebra Weblift supplied to J. Kumar Infraprojects' Line 6 packages at Jogeshwari and Powai, and how to rig U-girders and steel spans over live corridors.
Mumbai Metro Line 4 and 4A: Casting-Yard Rigging on the Wadala–Thane–Gaimukh Line
The lifting gear Sealinkers supplied to a Line 4 casting yard in Thane, set against MMRDA's heavy U-girder and steel-span lifts on the Wadala–Thane–Gaimukh corridor.
Mumbai Metro Line 2B: Rigging for the BKC Casting Yard and Mandale Depot
How Sealinkers and Zebra Weblift supplied slings and shackles to the contractors building Mumbai Metro Line 2B, from J. Kumar's BKC casting yard to the Mandale depot.
Mumbai–Ahmedabad Bullet Train (MAHSR C3): Wire Rope and Slings for L&T
What we supplied to L&T's Maharashtra package of the Mumbai–Ahmedabad high-speed rail line, the full-span launching chain it serves, and lessons for rope buyers.
Bullet Train Tunnel (MAHSR C2): Heavy Slings and 200 t Shackles for Afcons
The heavy slings, Crosby shackles and chain slings we supplied to Afcons' Mumbai tunnel package of the bullet train, and how to specify heavy rigging sets.
ProjectsKudankulam Units 3 & 4: Stud Link Chain and Crane Rope for L&T's HTS Package
The stud link anchor chain, crane rope, shackles and alloy chain we have supplied to L&T Construction's Hydro Technical Structures package at Kudankulam Units 3 & 4 since late 2024.
Kanpur Metro: Heavy Wire Rope Slings for KPIL–Gulermak and Afcons
How KPIL–Gulermak and Afcons completed Kanpur Metro's Phase 1 tunnels, the heavy slings and rope we supplied in 2025–26, and how to handle and recertify heavy slings between jobs.
Kaiga Units 5 & 6: Shackles, Slings and Wire Rope for MEIL's Nuclear Island Package
The shackles, wire rope slings and wire rope we supplied in one 2026 order to MEIL's Nuclear Island Mega EPC Package at Kaiga Units 5 & 6, and what the early nuclear-island phase asks of rigging.
ProjectsISRO Propulsion Complex, Mahendragiri: Turnbuckles and Grade 100 Chain for Tata Projects
The galvanised turnbuckles, Crosby Grade 100 alloy chain and links we supplied to Tata Projects for works at the ISRO Propulsion Complex, offered for TÜV SÜD inspection before dispatch.
Indore Metro Underground: Chain Blocks, Heavy Slings and Shackles for the HCC–TPL JV
How the HCC–Tata Projects JV launched Indore Metro's first TBM, the single order of chain blocks, heavy slings and shackles we supplied in mid-2026, and lessons.
HPCL Rajasthan Refinery: Heavy-Lift Slings and 500 t Shackles for MEIL
The heavy slings, wide-body shackles and round sling we supplied to MEIL's LLDPE/HDPE and polypropylene packages at HPCL's Rajasthan Refinery, and how to specify them.
Gurugram Metro: Wire Rope and Chain Slings for Dilip Buildcon's Casting Yard
How Gurugram's new metro moved from piling to 160-tonne U-girders in 2026, the slings we supplied Dilip Buildcon's Sector 33 casting yard, and what a precast yard asks of rigging.
ProjectsChennai Metro Phase II, TU01: Rigging Supply to Tata Projects at Madhavaram
How Tata Projects drove Corridor 3's first underground section with seven TBMs, the slings, rope and fittings we supplied its TU01 site from December 2024, and what a multi-shaft package asks of rigging.
ProjectsBhopal Metro BH-04: Hoists, Heavy Slings and Shackles for the KPIL–Gulermak JV
How the KPIL–Gulermak JV is taking Bhopal Metro underground beneath the railway station, the hoists, heavy slings and shackles we supplied its station sites in 2025–26, and how to specify them.