Kanpur Metro: Heavy Wire Rope Slings for KPIL–Gulermak and Afcons

By Sealinkers Engineering · Rigging & Lifting Engineering Team16 November 20266 min read

Kanpur Metro finishes its tunnels: KPIL–Gulermak and Afcons

On 30 March 2026, TBM Parvati broke through at Double Pulia station and completed the tunnelling for Kanpur Metro's Phase 1 [1]. That milestone belonged to the joint venture of Kalpataru Projects International (KPIL) and Gulermak, which is building the underground section of Line 2. It followed Afcons' own completion on Line 1: in October 2025 the Afcons–SAM India consortium recorded the final breakthrough of its underground package, the sixteenth tunnel breakthrough on that line [2]. Between them, the two contractors have taken Kanpur's metro beneath its busiest and oldest districts.

In 2025 and 2026, Sealinkers supplied both contractors with heavy rigging: wire rope slings of 60 mm to 64 mm (45–50 t SWL) and 20 mm wire rope, delivered to the KPIL–Gulermak JV's KNPCC-11 casting yard and to Afcons' Kanpur underground metro project. It was a short run of orders, and this case study keeps to what it covered.

The two underground packages

Line 2, package KNPCC-11 (KPIL–Gulermak JV)

  • Owner. Uttar Pradesh Metro Rail Corporation (UPMRC), which awarded KNPCC-11 in December 2023 for Rs 762.50 crore with a 30-month term [3].
  • Line. Line 2 runs about 8.38 km from Agriculture University to Barra-8 [3][1].
  • Scope. About 4 km of twin bored tunnels from the Agriculture Depot ramp to a ramp beyond Double Pulia, cut-and-cover tunnel and ramps, and three underground stations at Rawatpur, Kakadeo and Double Pulia [3].
  • Machines. Parvati (S-840C) is a refurbished 6.5 m Herrenknecht mixed-shield earth pressure balance machine, the seventh TBM commissioned for Kanpur's Phase 1 tunnelling [1].

Line 1, package KNPCC-06 (Afcons–SAM India)

  • Contract. Awarded by UPMRC in March 2022 for about Rs 1,087.67 crore, covering the underground section from Nayaganj to the Transport Nagar ramp on the 23.78 km IIT Kanpur–Naubasta line [2].
  • Stations. Three underground stations at Kanpur Central, Jhakarkatti and Transport Nagar [2].
  • Machines. Two Herrenknecht earth pressure balance TBMs, Azad and Vidyarthi, each making four drives; Vidyarthi's final breakthrough at Kanpur Central in October 2025 was the package's eighth [2].
  • Opening. In May 2025 an underground section of Line 1 including the new Kanpur Central station was opened to the public [4].

Both packages worked beneath a dense old city and around Kanpur Central, the main railway station, where tunnelling has to be planned around old buildings, utilities and live traffic.

How Sealinkers supported the Kanpur contractors

Our supply in 2025 and 2026 was modest in volume but heavy in kind:

EquipmentScale supplied
Heavy wire rope slings60 mm to 64 mm; 45 t to 50 t SWL
Steel wire rope (Powerform)20 mm

The deliveries went to the KPIL–Gulermak JV's KNPCC-11 casting yard in Kanpur and to Afcons' underground metro project. We do not have a record of which lift any sling or rope served, and we make no claim about the tunnelling or any particular operation. The notes below describe how equipment of this class is typically handled and maintained.

Heavy slings and rope at the end of a tunnel programme

Handling 60–64 mm slings

A 64 mm wire rope sling rated around 50 t is heavy and stiff enough that handling it is a task in itself. It is usually moved by crane rather than by hand, laid out straight before use, and kept away from sharp edges that would cut or kink it. Because a heavy sling is rarely used every day, it is easy for it to sit in a yard exposed to rain and dust. Store heavy slings on racks or timber, coiled loosely, with the eyes protected, and lubricate them if they will stand idle for long. See our guide to wire rope lubrication.

The eye, the hook and the bend

At this diameter, the rated capacity depends on how the sling is rigged. The eye must sit fully in the hook bowl without pinching; the bend around the load or a shackle pin must be generous, because a tight bend over a small diameter cuts the strength a sling can deliver; and the included angle of a pair of slings must be counted in the lift plan. Our note on sling angles and SWL sets out the factors. Order heavy slings with the crane hook and shackle sizes stated, so the eyes are made to fit.

20 mm wire rope: specify it fully

Wire rope of around 20 mm is a general-purpose size on a metro site, typically reeved on winches, hoists and small gantries or cut into slings. A purchase order that says only "20 mm wire rope" leaves too much open. State the construction (for example a six-strand or rotation-resistant type), the core (fibre or steel), the rope grade, the lay, whether it is galvanised, and the length on each reel. Ask for the manufacturer's test certificate with the minimum breaking force, and keep it with the equipment the rope is fitted to. When the rope is replaced, use the same construction as before unless the equipment maker approves a change, because drum grooves and sheaves are sized for it. Our wire rope construction guide explains the options.

When tunnelling ends: reuse and recertification

Kanpur's Phase 1 tunnels are complete, and as the work moves on to systems installation, station finishing and trial runs [1], heavy rigging is often released from one site and moved to another. Before a heavy sling goes into service on a new job it should be inspected by a competent person, checked against its certificate and tag, and, where the inspection or the next client requires it, proof-load tested again. A sling without a legible tag or traceable certificate should not be used until it has been re-examined. Our proof-load testing service uses a 1,200 T test bed at our in-house test house.

Lessons for buyers

  • 1. Order heavy slings with their fittings in mind. State the hook and shackle sizes and the hitch so the eyes and lengths suit.
  • 2. Store heavy slings properly. Rack them off the ground, protect the eyes and lubricate if idle.
  • 3. Re-examine before redeployment. Gear moving between projects should be inspected and, where required, retested before use.
  • 4. Keep tags legible. The tag links the sling to its certificate; replace a damaged tag only after re-examination.
  • 5. Write the rope specification in full. Diameter alone does not define a rope; state construction, core, grade, lay and finish on the order.

Frequently asked questions

What did Sealinkers supply to Kanpur Metro?

In 2025 and 2026 we supplied heavy wire rope slings of 60–64 mm (45–50 t SWL) and 20 mm wire rope to the KPIL–Gulermak JV's KNPCC-11 casting yard and to Afcons' Kanpur underground metro project.

Can you make wire rope slings above 60 mm?

Yes. We make large-diameter wire rope slings at our own works, including matched pairs, and proof-load test them before dispatch with certificates.

Can a used heavy sling be recertified?

A used sling can be inspected and, if it passes, proof-load tested and re-certified. A sling that shows broken wires beyond the discard limits, kinks, crushing or a damaged ferrule should be withdrawn.

Do you deliver to Uttar Pradesh?

Yes. We deliver across India from Mumbai.

Need heavy slings for your next package?

Send us the loads, hook sizes and hitch for your heavy lifts. We will propose slings and rope with certificates. Contact Sealinkers.

Sources

  • [1] Metro Rail News, Kanpur Metro's tunnelling work completed with TBM Parvati's breakthrough at Double Pulia station, 31 March 2026 — metrorailnews.in
  • [2] The Metro Rail Guy, Afcons records Kanpur Metro Line-1's final TBM breakthrough, 14 October 2025 — themetrorailguy.com
  • [3] The Metro Rail Guy, KPIL–Gulermak awarded Kanpur Metro Line 2's underground contract KNPCC-11, 23 December 2023 — themetrorailguy.com
  • [4] The Machine Maker, PM Modi flags off underground section of Kanpur Metro built by Afcons, 31 May 2025 — themachinemaker.com
Share this guide

Related Guides

Ready to put this into practice?

Every item ships certified, and our in-house test house backs it with the paperwork.

Sealinkers Engineering

Rigging & Lifting Engineering Team

Sealinkers has supplied and certified rigging, lifting and mooring equipment from Darukhana, Mumbai since 1977. These guides are written and checked by the engineers who specify this gear and proof-load it on our own test bed.

  • in-house test house — proof-load bed from 1 to 1,200 tonnes
  • Proof-load testing and certification in-house since 1977, Darukhana, Mumbai
  • Class-society interfaces: IRS, ABS, LRS and BV