sealinkers@sealinkers.com


image11

RORO BRIDGE

Sealinkers Pvt Ltd was awarded the contract for the lifts for the final parts assembly of the RORO bridge in Dahej, Gujrat weighing from 500 to 875 tons. Wire ropes slings with diameters upto 127mm (5") were manufactured, tested and shackles of capacities upto 300Tons were supplied in a matter of days thus carrying out another successful prestigious heavy lift.

image12

THE DOME LIFT

Sealinkers Pvt ltd was awarded the contract for the supply of Shackles, Wire ropes slings and turnbuckles for the final lift and installation of the 350Tons dome of the Nuclear Power plant in Kakrapar, Gujrat.After rigorous inspections and load tests witnessed by some of India's experts in the field of nuclear power construction,the material was manufactured and supplied in record time.

image13

WINDMILL LIFT

Sealinkers Pvt Ltd, a pioneer in the market, has through R&D developed a range of products specialised for Windmills and Windmill Turbine Lifting.Sealinkers Pvt Ltd was awarded the contract for a 380 Tons windmill turbine lift, providing spreader beams, shackles and wire rope slings. The lift was a complete success.